China KD(X) Series Ceiling Air Conditioning Units - High-Efficiency Suppliers & Factory for Commercial Use

Features and Applications of KD(X) Series Ceiling Air Conditioning Units

The KD(X) series ceiling air conditioning units represent a reliable solution for central air conditioning systems. Manufactured in China, these end-mounted air handling units are designed to filter, cool, dehumidify, heat, and humidify the air, while also introducing fresh air. They are particularly suitable for small commercial and industrial building air conditioning projects, allowing for efficient air delivery through ducts over distances. This versatile series includes 13 models and 39 specifications, with air volumes ranging from 1500m³/h to 15000m³/h and cooling capacities from 8.4kW to an impressive 324.8kW. The units feature a sleek white or blue design and are equipped with high-performance nylon filters. Additionally, the heat exchanger is constructed with copper tubes and high-efficiency aluminum fins, significantly enhancing heat exchange efficiency after mechanical expansion.

Modern Production Characteristics:

● Superior Quality

● Cost-Effective Solutions

● Rapid Production Cycle

As a leading factory and supplier of ceiling air conditioning units in China, we are committed to delivering high-quality products that meet the diverse needs of our clients.

    Installation of the Unit

    • The air conditioning unit should be installed horizontally within the ceiling cavity. The side of the condensate water pipe is allowed to be slightly lower by 0.5% but not higher, to ensure the smooth discharge of the condensate water. There should be sufficient installation and maintenance space around the unit.
    • The condensate water discharge connected to the unit must have a water seal, and the water seal should have sufficient height.
    • The connecting pipe of the evaporator is inlet-down and outlet-up. A stop valve and filter should be installed at the inlet.
    • The air duct connected to the unit needs to be flexibly connected. The water pipe connected to the unit should use a flexible connection. The torque during connection should not be too large to avoid damaging the heat exchanger. The pipeline must have a separate support and the weight should not be borne by the unit.
    • The motor of the fan should have good grounding. In addition, it should have other reliable protection devices such as overload, overheating, and phase loss.
    Installation of the unit

    Operation and Maintenance of the Unit

    Media & Operational Pressure

    The cold and hot media of the unit should be clean softened water, and the working pressure should not exceed 1.6 Mpa.

    Bearing Temperature

    During normal operation of the unit, the temperature rise of the fan bearings should not exceed 40℃.

    Exhaust & Seasonal Temperatures

    The outlet pipe of the unit is equipped with an exhaust valve. Before the first operation and during the cold and hot conversion, the exhaust valve should be opened to discharge the air in the heat exchanger and pipeline to avoid affecting the heat exchange effect. The summer cooling water temperature of the unit should not be lower than 5℃, and the winter hot water temperature should not be higher than 70℃.

    Cold Region Startup & Shutdown

    In extremely cold regions in winter and when the fresh air unit is in heating mode, the heating unit should be turned on for 5-10 minutes first, then the supply fan should be started to prevent the formation of ice plugs in the heat exchanger due to the accumulation of cold air; when shutting down, the fresh air valve should be closed first, then the heating unit, and finally the supply fan.

    Anti-Freeze & Rust Protection

    When the unit is not in use in winter, the water in the coil should be drained, and the pipe should be dried with compressed air. If the water cannot be blown clean, antifreeze should be added to the pipe. If the unit is not in operation for a short time in winter, ensure that there is hot water circulation in the pipe to prevent rust and freezing. Except for winter, when the heat exchanger is not in use in other seasons, it should also be filled with water to reduce corrosion.

    Filter Maintenance

    Filters should be cleaned regularly to ensure the performance of the unit. If the air volume decreases, it is generally caused by excessive dust accumulation in the filter.

    Periodic Inspection Schedule

    After one month of operation of the unit, check whether the fastening bolts and the solid bolts of the fan are loose. After two to three years of operation of the unit, a comprehensive maintenance should be carried out, remove the scale in the heat exchanger tube, clean the heat exchanger fin with compressed air or water. The lubrication parts of the fan, motor, etc. should be regularly lubricated with oil.

    Frequently Asked Questions (FAQ)

    Q: What are the slope and sealing requirements for condensate water drainage?
    The condensate water pipe side may be slightly lower by up to 0.5% (never higher) to ensure smooth drainage. Furthermore, the drain pipe must be installed with a water seal of adequate height.
    Q: What are the operating limits for media pressure and water temperature?
    The system requires clean softened water at a working pressure not exceeding 1.6 Mpa. Cooling water in summer must not fall below 5℃, and heating water in winter must not exceed 70℃.
    Q: How should the fresh air unit be started and stopped in severe winter conditions?
    Turn on the heating unit for 5 to 10 minutes prior to starting the supply fan to prevent ice plugs in the heat exchanger. When shutting down, close the fresh air valve first, turn off the heating unit, and finally stop the supply fan.
    Q: How do you prevent heat exchanger freezing and corrosion during idle periods?
    If inactive in winter, drain the coil and blow it dry using compressed air, or add antifreeze if residual water remains. For short shutdowns, maintain continuous hot water circulation. During all other seasons, keep the heat exchanger filled with water to minimize corrosion.
    Q: What maintenance schedule should be followed after initial commissioning?
    Inspect all fastening and fan solid bolts after the first month of operation. After 2 to 3 years, perform comprehensive servicing: descale the heat exchanger tubes, clean the fins with water or compressed air, and regularly grease and lubricate fan and motor components.
    Q: What is the primary cause of reduced airflow during operation?
    A decrease in air volume is typically caused by heavy dust accumulation on the filters. Regular filter cleaning is necessary to maintain standard performance.

    Make an free consultant

    Your Name*

    *Name Cannot be empty!

    Phone Number

    Country

    Remarks*

    * Enter product details such as size, color,materials etc. and other specific requirements to receive an accurate quote. Cannot be empty
    *Need to accept terms
    reset